Replacement construction of old brickworks, Haufland Riedikon

2024

The replacement construction of a modern office and commercial building using timber construction methods is combined with the use of clay as a material. The implementation impresses with its sustainable construction and excellent CO2 balance.

Facts and images
Construction Data
Involved

The project
The office building is designed entirely as a timber construction from the ground floor upwards, including the enclosed stairwell and lift shaft. To improve the indoor climate and highlight the history of the building site as a brickworks, the stairwell was walled in with unfired clay bricks. The commercial building combines a variety of uses such as workshops, storage rooms, and offices under one roof. A 10-ton crane is installed on a crane runway made of construction beech in the 8-meter-high workshop. The flat roof houses a large 1,300 m² photovoltaic system that generates sustainable energy. The project combines modern timber construction with historical elements and sustainable energy production.

The construction method
Both buildings were constructed using a skeleton structure with high-performance beams made of construction beech. The office building is mainly reinforced by the central stairwell, while the commercial building also features regular exterior walls. Moisture-resistant glued laminated timber made of ash was used for the beams in the car wash.

The challenge
The office building, located close to the main road, is designed to remain stable even in the event of high impact loads and subsequent failure of the edge supports. In commercial construction, the crane runway was also constructed using timber, which was made possible by precise fatigue analysis.

Construction Data

- Ceilings made of CLT: 1650 m2

- Ceilings made of horizontal glulam: 1800 m2

- Flat roof made of hollow box beams: 2000 m2

- Pitched roof: 1000 m2

- Total wood used in kg: 880'000 kg


Construction costs

- BKP214: approx. CHF 5.0 million


Services of Timbatec

- SIA Phase 31 Vorprojekt

- SIA Phase 32 Bauprojekt

- SIA Phase 41 Ausschreibung und Offertenvergleich

- SIA Phase 51 Ausführungsprojekt

- SIA Phase 52 Ausführung

- SIA Phase 53 Inbetriebnahme

- Statik und Konstruktion

- Fachplanung Bauphysik

- Fachplanung Brandschutz

Architekt
asa AG
8640 Rapperswil


Holzbau
Jampen Holzbau
8335 Hittnau


Holzbau
Kübler Holzbau AG
8618 Oetwil am See


Holzbau
Moser Holzbau AG
8625 Gossau


Holzbau
Bertschinger Innenausbau AG
8608 Bubikon


Auftraggeber
Gadola Immobilien- und Verwaltungs AG
8618 Oetwil am See


Images: Kaspar Thalmann