The project
The new, modern works yard provides the municipality of Matzingen with the necessary infrastructure to meet the high demands. Thanks to local wood and local craftsmanship, the added value remains in the region. The light-flooded rooms provide the employees with contemporary workplaces.
The construction
The entire workshop, including the supporting structure and all surfaces, is made of wood. The office section was built using prefabricated elements. The workshop is designed as a hall construction and is column-free. The floor slabs of the office section consist of horizontal glulam elements. The roof is designed as a box girder element. The roof in the workshop was also designed as a box girder element.
The challenge
Timbatec paid special attention to the visible wood surfaces. During the planning and construction work, it was always important to take into account that the mostly native wood was not clad or painted.
Construction Data
- Gross floor area: 650 m2
- Office: Glulam elements installed on the floor slab
- Roof: Box girder
- Workshop: Roof box girder
Construction costs
- BKP 1-9: CHF 2.65 million
- BKP 2: CHF 600'000
- BKP 214: CHF 600'000
Services of Timbatec
- SIA Phase 31 Preliminary project
- SIA Phase 32 Construction project
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- SIA Phase 52 Execution
- SIA Phase 53 Commissioning
- Statics and construction
- Technical planning for fire protection
Client
Matzingen municipality
9548 Matzingen
Architect
Lilin Architekten sia GmbH
8004 Zurich
Timber construction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich
Timber construction
Appert Holzbau AG
8376 Fischingen
Civil engineer
suisseplan Ingenieure AG
5001 Aarau
Construction Management
REBOBAU
8320 Fehraltorf